GE
D
IRECTION
FQ091019, R
EVISION
2
V
IVID Q
N S
ERVICE
M
ANUAL
Chapter 8 - Replacement Procedures
8-31
5.) Lift the P&M Board
upwards
away from the Bottom Assembly and remove it completely, as shown
.
8-3-1-5
P&M (Probe and MUX) Board Installation Procedure
NOTE:
When performing the following installation procedure steps, it may be helpful to review the
appropriate movie clips previously referenced in the
P&M (Probe and MUX) Board Removal
1) Return a new P&M Board to the system, pushing it
downwards
into position on the Bottom
Assembly. Make sure it is properly seated before returning and fastening the two screws (previously
removed). Refer to
and
2.) Return and fasten the four screws to secure the P&M Board to the RFI Board, as shown in
.
3.) Return the Control Panel and Keyboard, as described in the
Installation Procedure" on page 8-12
4.) Return the bearing handle, as described in the
"Bearing Handle Installation Procedure" on page
.
5.) Proceed to perform the following functionality tests:
-
"SafeLock Cart - Grounding Continuity" on page 10-22
- only if the Vivid q N system is
currently mounted on the SafeLock cart
-
"SafeLock Cart - Chassis Current Leakage Test" on page 10-24
-
"Calibration Tests" on page 7-25
-
"Full System Test" on page 7-10
Figure 8-33 Removing the Probe and MUX Board from the Bottom Assembly
CAUTION
When installing boards, ESD may cause damage to a board. Always have the ESD hand strip
connected to the machine chassis and to your hand.