GE H
EALTHCARE
RAFT
V
OLUSON
E8 / V
OLUSON
E6
D
IRECTION
KTD102576, R
EVISION
7
DRAFT (A
UGUST
23, 2012)
S
ERVICE
M
ANUAL
4-2
Section 4-3 - General Procedure
Section 4-3
General Procedure
4-3-1
Power On / Boot Up
4-3-1-1
Scanner Power On
1.) Connect the Main Power Cable to the back of the system.
2.) If not already done, screw on the pull-out protection of the mains power cable with the 2 screws.
3.) Connect the Main Power Cable to a hospital grade power outlet with the proper rated voltage.
Never use an adapter that would defeat the safety ground.
4.) Switch ON the Circuit Breaker at the rear of the system.
CAUTION
!! CAUTION:
SYSTEM REQUIRES ALL COVERS
Operate this system only when all board covers and frame panels are securely in place.
The covers are required for safe operation, good system performance and cooling purposes.
NOTICE
!! NOTICE:
Lockout/Tagout Requirements (For USA only)
Follow OSHA Lockout/Tagout requirements by ensuring you are in total control of the Power Cable
on the system.
NOTICE
!! NOTICE:
After turning off a system, wait at least 10 seconds before turning it on again.
The system may not be able to boot if power is recycled too quickly.
Figure 4-1 Circuit Breaker, pull-out protection and main power cable at rear of system
NOTICE
!! NOTICE:
When AC power is applied to the scanner, the
ON/OFF
Standby button on the control panel illuminates
amber, indicating that the System (including the Back-end Processor) is in
Standby
mode.
Signed
Date
TAG
&
LOCKOUT
Circuit Breaker
Main Power Cable
pull-out protection
1 screw
1 screw
Summary of Contents for Voluson E8
Page 2: ......
Page 11: ...GE HEALTHCARE VOLUSON E8 VOLUSON E6 DIRECTION KTD102576 REVISION 7 SERVICE MANUAL ix ZH CN KO...
Page 431: ......