Instruction
Follow this sequence to place WAVE Bioreactor units on the shelves.
Action
Step
Release the locks for the selected shelf and extend the shelf to its outermost
position.
1
Lift the WAVE Bioreactor unit onto the shelf, well in front of the guiding rails.
2
Connect all hosing and cables to the WAVE Bioreactor unit. Make sure that
they are routed so that they will not be stressed or blocked independently
of the shelf position.
3
14
WAVE Cabinet 20/50 User Manual 28-9651-86 AA
4 Installation
4.1 Placing WAVE Bioreactor units in the cabinet
Summary of Contents for WAVE Cabinet 20
Page 1: ...GE Healthcare WAVE Cabinet 20 50 220 240 V User Manual ...
Page 2: ......
Page 4: ......
Page 23: ......