Action
Step
Push the shelf back to its innermost position and make sure that the locks
are engaged.
4
Open the rear door.
5
Access the WAVE Bioreactor unit from the rear and pull it towards you and
to the right until its rubber feet are positioned in the corners of the guiding
rails as shown in the figure.
6
Mount the top tray and connect all its hoses, according to the manual for
the instrument.
7
Extend and push back the shelf with the placed WAVE Bioreactor unit making
sure that all hoses and cables are routed so that stress and blocking are
avoided.
8
NOTICE
Avoid stress and blocking. It is important that the in-
strument, cables and hoses are positioned so that
stress and blocking are avoided.
WAVE Cabinet 20/50 User Manual 28-9651-86 AA
15
4 Installation
4.1 Placing WAVE Bioreactor units in the cabinet
Summary of Contents for WAVE Cabinet 20
Page 1: ...GE Healthcare WAVE Cabinet 20 50 220 240 V User Manual ...
Page 2: ......
Page 4: ......
Page 23: ......