Action
Step
Perform a visual inspection of the mated connection to confirm that the
sealing O-rings are in place and that they are not distorted.
9
NOTICE
If there is any indication that the connection might not
be aseptic, immediately clamp off this probe sheath
assembly on the short section of silicone tubing be-
tween the disposable bag and the female ACD connec-
tor.
Xcellerex XDM 50-1000, XDUO 100-1000 mixers Operating Instructions 29251615 AD
175
6 Preparation
6.4 Prepare and install the probes
6.4.4 Insert probes into the disposable bag
Summary of Contents for Xcellerex XDM Series
Page 2: ...Page intentionally left blank...
Page 6: ...Page intentionally left blank...
Page 320: ...Page intentionally left blank...
Page 321: ...Page intentionally left blank...