Action
Step
Verify that the impeller baseplate is magnetically connected to the agitator
drive head.
1
Verify that the probe Kleenpak connectors are aligned with the probe port.
2
Remove the protective caps from both ACD connectors.
3
Hold the male ACD connector (on the probe sheath assembly) and align it
with the female connector (on the probe port on the disposable bag), so that
the white membrane strips are facing each other as they exit the flat sides
of the connectors.
4
Xcellerex XDM 50-1000, XDUO 100-1000 mixers Operating Instructions 29251615 AD
171
6 Preparation
6.4 Prepare and install the probes
6.4.4 Insert probes into the disposable bag
Summary of Contents for Xcellerex XDM Series
Page 2: ...Page intentionally left blank...
Page 6: ...Page intentionally left blank...
Page 320: ...Page intentionally left blank...
Page 321: ...Page intentionally left blank...