8.2
Maintenance schedules
Introduction
It is the responsibility of the system owner to make sure that the required maintenance
is performed.
The user should inspect the system for signs of wear and damage and request a service
visit if anything abnormal is found. Contact your GE representative to schedule mainte-
nance and service.
Cleaning before planned
maintenance/service
To ensure the protection and safety of service personnel, all equipment and work areas
must be clean and free of any hazardous contaminants before a Service Engineer starts
maintenance work.
Please complete the checklist in the On Site Service Health and Safety Declaration Form
or the Health and Safety Declaration Form for Product Return or Servicing, depending on
whether the instrument is going to be serviced on site or returned for service, respectively.
Copy the form you need from Section 10.10 Health and Safety Declaration Forms, on
page 295 or print it from the PDF file available on the User Documentation CD.
250
Xcellerex XDM 50-1000, XDUO 100-1000 mixers Operating Instructions 29251615 AD
8 Maintenance
8.2 Maintenance schedules
Summary of Contents for Xcellerex XDM Series
Page 2: ...Page intentionally left blank...
Page 6: ...Page intentionally left blank...
Page 320: ...Page intentionally left blank...
Page 321: ...Page intentionally left blank...