D
GB
F
E
33
96416-08.2020-DGbFEIRu
10.1 Capacity regulator
Fig. 18
CR 1
CR 2
ATTENTION
If the capacity regulator is installed at the factory, it is subsequently
installed and connected by the customer
.
10
|
Accessories
CR 1
Delivery condition 1 (from the factory):
Cylinder cover prepared for capacity regulator.
Fig. 20
Before commissioning, the blind flange with
screws must be removed and replaced by the
new set capacity regulator with O-ring joints
and screws. Observe position and construction
of the capacity regulator.
Attention! Compressor is under pressure!
Depressurize the compressor first.
Delivery condition 2 (from the factory):
Connect capacity regulator in terminal box or
switch cabinet.
Fig. 19
Fig. 21
HG44e
HG56e
Summary of Contents for Bock HG44e/475-4
Page 41: ......