Fig.6:
Anchoring details
A
Drilled chemical anchor (M20)
B
Grouted anchor recesses (M20)
1
Installed chemical anchor before placing the base frame
2
Installing chemical anchor after placing the base frame (base frame cannot be removed
easily)
3
Drilling angle
1.3.5.3 Mounting the base frame on a concrete block
General
After the space between base frame and concrete base has been filled-up with a
filling grout, the package base frame must be secured tightly to the foundation
block or floor.