D
GB
F
E
23
96416-03.2017-DGbFEIRu
5
|
Electrical connection
Relay position INT69 G
B2 12 14 11
Fig. 19
5.8 Function test of the trigger unit INT69 G
Before commissioning, after troubleshooting or making changes to the control power circuit, check
the functionality of the trigger unit. Perform this check using a continuity tester or gauge.
Gauge state
Relay position
Deactivated state
11-12
INT69 G switch-on
11-14
Remove PTC connector
11-12
Insert PTC connector
11-12
Reset after mains on
11-14