•
Disconnect all power and utility lines.
•
Markings, e.g. on lines, must not be removed.
•
Do not climb on the component. Use suitable access aids and working
platforms.
•
Mark the lines (if unmarked) prior to disassembly to ensure they are not
confused when re-assembling.
•
Protect open line ends with blind plugs against ingress of dirt.
•
Pack sensitive parts separately.
•
For longer periods of standstill, observe the storage conditions, see .
10.2
Inspections
Checking parts are firmly secured
Fig.60
Carry out the following steps:
1.
Check that the electrical connectors are properly secured.
2.
Check that the air hose connections are firmly secured.
3.
Check that the clamp (15) is firmly in place.
4.
Check that the plug (23) is firmly in place.
5.
Check the sound absorber, filter, non-return valve and the exhaust air throttle
for soiling.
6.
Check the housing for mechanical damage.
7.
Check the union nut for the cable glands for a tight fit.
8.
Check solenoid valves and optional NOT element for pressure-tight fit.
9.
Check hood and base for firm screws. Tighten all three screws to 2 Nm if
necessary.
®
Done
Maintenance
Inspections
430BAL010699EN_6
17.03.2022
85
Summary of Contents for T.VIS A-15
Page 6: ...430BAL010699EN_6 6 17 03 2022...
Page 116: ......