8.
Close the air connection Y1 with a sealing plug (23) since the control top
T.VIS M-15 has an inner air duct.
Fig.32
9.
Perform commissioning, see Chapter 6, Page 36 and Chapter 7, Page 73.
®
Done.
Assembly and installation
Mounting the Control Top to Different Valves
430BAL010697EN_2
60
15.04.2020
Summary of Contents for T.VIS M-15
Page 6: ...430BAL010697EN_2 6 15 04 2020...
Page 53: ...Fig 27 Assembly and installation Electrical connections 430BAL010697EN_2 15 04 2020 53...
Page 55: ...Fig 28 Assembly and installation Electrical connections 430BAL010697EN_2 15 04 2020 55...
Page 119: ...Appendix 430BAL010697EN_2 15 04 2020 119...
Page 120: ......