7
Start-up
7.1
Safety precautions
Initial commissioning
For initial commissioning, the following principles apply:
•
Take protective measures against dangerous contact voltages in accordance
with pertinent regulations.
•
The control top must be completely assembled and correctly adjusted. All
screw connections must be securely tightened. All electrical cables must be
installed correctly.
•
Reliably secure machine parts which have already been connected against
inadvertently being switched on.
•
After conversion of the control top, residual risks must be reassessed.
Commissioning
For commissioning, the following principles apply:
•
Only allow properly qualified staff to set the control top into operation.
•
Make sure all connections are properly established.
•
The safety devices for the control top must be complete, fully functional and in
perfect condition. Check the function before starting any work.
•
When the control top is switched on, the danger zones must be free.
•
Remove any liquids that have escaped without leaving residues.
7.2
Commissioning – Control Top with Solenoid Valves
Activating the Control Top
Once the positioner has been properly mounted on the valve and the electrical
and pneumatic connections have been established correctly, commissioning can
be carried out.
Notice
► Only carry out the SETUP when the pipe is empty.
Carry out the following steps:
1.
Switch on the control air supply.
!
Make sure that the supply air and exhaust air throttles are not completely
closed.
2.
Check the valve function by activating the solenoid valve:
®
Switch on solenoid valve Y1 using the manual operating element on the
solenoid valve: Use a screwdriver to turn the screw (S) 0 from 0 to 1.
®
Switch the solenoid valves Y1 off again: use a screwdriver to turn the
screw (S) in direction 0.
Start-up
Safety precautions
430BAL010747EN_3
38
24.07.2020