26
Installation Instructions
REPLACE THE BASE GRILLE
Replace the grille by installing the two Phillips
head screws.
7
SET THE CONTROLS
Set the controls to the recommended setting.
8
INSTALLING THE REFRIGERATOR
(CONT.)
START THE ICEMAKER
Set the icemaker power switch to the I (on)
position. The icemaker will not begin to operate
until it reaches its operating temperature of
15°F (–9°C) or below. It will then begin operation
automatically. It will take 2–3 days to fill the ice
bin.
NOTE:
In lower water pressure conditions, the water
valve may turn on up to 3 times to deliver
enough water to the icemaker.
9
Power
switch
Power
switch
Summary of Contents for GSE25HSHSS
Page 34: ...on some models 34...
Page 37: ...37 Notes GEAppliances com...
Page 38: ...38 Notes...
Page 39: ...39 GEAppliances com...
Page 40: ...Notes 40...
Page 78: ...78 Notes...
Page 79: ...79 Notes ww electromenagersge ca...
Page 117: ...Notas GEAppliances com 117...
Page 120: ...Notas 120...
Page 121: ...121 GEAppliances com...
Page 122: ...Notas 122...
Page 123: ...123 GEAppliances com...
Page 124: ...Notas 124...
Page 125: ...125 GEAppliances com...
Page 126: ...Notas 126...
Page 127: ...127 GEAppliances com...