Installation Instructions
13
Final Check List
Check to make sure the circuit breaker is closed (Reset), or the circuit fuses are replaced.
Be sure power is in service to the building.
Check to be sure that all packaging materials and tape on metal panel (if applicable) under
control knobs have been removed.
Operation Check List
Check to make sure the Clock display is energized. If a series of horizontal red lines appear in
the display, disconnect power immediately. Recheck the range wiring connections. If a change
is made to connection, retest again. If no change is required, have building wiring checked for
proper connection and voltage. It is recommended that the clock be replaced if the red lines
appear.
Push down and turn any one of the four surface control knobs to “MED” setting to observe that
the element glows within 15 seconds. Turn the knob off when the glow is detected. If the glow is
not detected within the time limit, recheck the range wiring connections. If change is required,
retest again. If no change is required, have building wiring checked for proper connections and
voltage.