background image

Printed in USA ©  0504

T-310

6

Geberit In-Wall Pressure Assist Toilet System

Installation & Maintenance Instructions 

2

The 2 x 6 framework must be secured firmly to the

floor and ceiling for proper installation.  Locate the

supporting studs and reinforce with additional nails

or screws.

Make sure rough opening(s) are properly plumbed

and square.

3

1. Place the tank & carrier assembly into the desired location. The carrier metal frame must be flush with the front

of the mounting studs to provide maximum support for the wall surface (applied later).

2. Mark the 6 anchor hole locations in the base and the 4 side mounting hole locations (2 each side) on the studs.
3. If the discharge is to be installed vertically in ground, mark the discharge elbow location on the base support.
4. Remove the tank & carrier assembly from the studs.
5. Drill six 3/16" holes in the base support; drill four 5/16" holes on the side studs where marked.
6. For vertical discharge only, bore a 4" hole into the base plate where marked.
7. Install tank & carrier into framework and secure with hardware provided. 
8. Install 3" shielded coupling (provided) to connect discharge elbow to waste pipe.

TANK & CARRIER INSTALLATION

Reinforce with additional

nails or screws

Side Mounting Hole Locations

5/16" (2 each side)

6 Base Anchor

Holes (3/16")

Vertical In Ground Installation

Horizontal Above Ground Installation

Finished Seat 

Height

5¼"

(133 mm)

X

T + FSH - 5¼ = X

Distance between 

top of the bowl rim surface 

and discharge outlet centerline

Distance between 

discharge outlet centerline

 and raw floor

T

1

IMPORTANT! The Finished Seat Height for the bowl must be determined 

prior to

installing the carrier. Please

take into account the seat height for final height dimensions.

NOTE: When determining X, include the dimension for the finished floor covering (up to .5").

ww

w.TheA

nwserLine.com

Summary of Contents for Chicago Faucets 111.817.00.1

Page 1: ...reserved The information in this manual is subject to change without notice Notice to Installers Please leave this manual with the facility manager after complet ing the Pressure Assist Toilet install...

Page 2: ...scharge Extension Kit 241 215 00 1 Printed in USA 0504 T 310 2 Geberit In Wall Pressure Assist Toilet System Installation Maintenance Instructions HOW TO ORDER Contact your local Geberit dealer or vis...

Page 3: ...F CENTER STUD FRONT CENTER HOLE FRONT VIEW SIDE VIEW Printed in USA 0504 T 310 3 Geberit In Wall Pressure Assist Toilet System Installation Maintenance Instructions DIMENSIONS SAFETY INFORMATION Read...

Page 4: ...0504 T 310 4 Geberit In Wall Pressure Assist Toilet System Installation Maintenance Instructions 22 558mm FINISHED SEAT HEIGHT FSH 9 230mm 7 1 2 190mm FINISHED WALL DIMENSIONS w w w T h e A n w s e r...

Page 5: ...4 Actuator Rod 5 Drop Ear Elbow 1 2 NPT 6 Shutoff Valve 1 2 NPT 7 Actuator Box Guard Cover 8 Actuator Lock Pins 9 Actuator Retaining Frame 10 Actuator Panel 11 Screws Vandal Resistant Ref Description...

Page 6: ...s 5 Drill six 3 16 holes in the base support drill four 5 16 holes on the side studs where marked 6 For vertical discharge only bore a 4 hole into the base plate where marked 7 Install tank carrier in...

Page 7: ...t may become clogged and cause slow water flow especially in new construction To clean filter turn shutoff valve to OFF disconnect braided hose remove filter and clean Reinstall filter and connect bra...

Page 8: ...pigot side of each pipe Fill Discharge A 1 1 Remove the plugs from the fill and discharge open ings of tank carrier assembly 2 Install the bowl inlet adapter and discharge adapter fully into their res...

Page 9: ...rods 6 1 Rods should protrude 3 from face of wall Adjust rods if necessary 2 Secure rods to tank carrier assembly using locknuts provided 1 2 3 4 UP 7 1 Place the bowl fully onto the four threaded rod...

Page 10: ...ose to the shutoff valve and place the other end of the hose into a container or drain 4 Allow supply water to flow until clear 5 Disconnect the drain hose and reconnect the braided hose to the shutof...

Page 11: ...p 3 Push Step 1 HOW THE IN WALL PRESSURE ASSIST TANK WORKS 3 Stages of the Flush Cycle Flush Stage The flush begins when the actuator valve is depressed and ends when the tank has discharged all of it...

Page 12: ...ll pop out if broken Replace cap assembly 241 214 00 0 Turn off water supply valve Flush toilet then unscrew the braided hose supply line from the cap inlet Remove and clean the screen fil ter Open su...

Reviews: