DELIVERY 

 

Receiving the delivery 

 

The following matters should be checked when receiving the district heating substation delivery: 

 

There are no signs of damage during shipping 

 

The delivery corresponds to the order in all aspects 

 

After verifying that the product is in good condition and corresponds to the order, sign the waybill 

and keep your copy stored 

 

If the delivery has been damaged during shipping, fill in the shipping damage form immediately. 

The form must be signed by both the recipient and the forwarder’s representative (such as the driver). Each driver carries 
the form for reporting shipping damage. 
 

Moving the substation 

 

The district heating substation is mounted on a transport platform that allows the substation to be moved and lifted to the site of 
installation by means of a pallet jack and lifting slings. Plan the easiest route to the site and be careful not to break floor and wall 
surfaces, stairs, door frames or other structures on the property. 
 
Do not damage the substation during lifting! The district heating substation contains fragile components. If the delivery includes 
separate lifting instructions or designated lifting points, these must be followed carefully. The heat distribution substation may not 
be lifted without the support of the transport platform. The transport platform under the district heating substation may not be 
removed until at the site of installation. 
 

Storage 

If the district heating substation is stored before installation, ensure that the site of storage is warm and dry. 
 

INSTALLATION AND COMMISSIONING 

 

Installation 

 

The district heating substation may be installed and connected only by a professional technician. The connections must comply with 
local standards and regulations. 
 
Move the district heating substation to the site of installation according to the instructions under section “Moving the substation”. 
Sufficient space must be reserved around the substation for installation and maintenance. The substation is installed directly on the 
floor and does not need to be mounted on the platform. 
 
Use the adjustable legs included in the delivery to adjust the substation at the desired height. The district heating substation should 
be level. Tighten the tension nuts on the adjustable legs carefully to ensure that the substation remains level and in the correct 
position. 
 
Inspect and tighten all joints in the district heating substation as they may have loosened during shipping. 
 
Check that the product corresponds to the plans and technical specifications included in the separate delivery materials. 
 
All aids used during transport must be removed before commissioning the district heating substation. 
Before installation, all pipes and couplings must be cleaned and rinsed. 
 

Pipe connections 

 

Ensure that all pipe connections are in accordance with the plans and technical specifications included in the delivery materials. 
Threaded, flanged and welded couplings are used for connecting the substation to the district heating network and internal 
networks. 
 

Summary of Contents for G-Power

Page 1: ...Installation Operation and Maintenance Manual G Power District Heating Substation...

Page 2: ...gy and the environment Optimal savings are achieved through combined heat and electricity production which has a fuel efficiency of 80 to 90 DISTRICT COOLING IN GENERAL District cooling is an environm...

Page 3: ...mperature and pressure warning Check the maximum pressure and temperature values for the equipment from the machine plate Compare these values to those given by the district heating supplier The distr...

Page 4: ...tion Storage If the district heating substation is stored before installation ensure that the site of storage is warm and dry INSTALLATION AND COMMISSIONING Installation The district heating substatio...

Page 5: ...rainage valves are closed Surge tank is connected Threaded and flanged couplings are tightened Safety valves are inspected and operational Fill the district heating substation with the flow medium and...

Page 6: ...d The powerful turbulent flow creates a continuous self cleansing effect on the heat delivery surfaces If the heat exchanger becomes dirty for any reason it can be cleaned by backflushing and if neces...

Page 7: ...exceeding the permitted maximum pressure pressure shocks external strain temperature mechanical strain etc repairs by a maintenance company other than one approved by Gebwell Oy poor quality of circul...

Page 8: ...Gebwell Ltd Patruunapolku 5 FI 79100 Lepp virta FINLAND Business ID 2008956 7 Tel 358 0 20 123 0800 Telefax 358 0 17 554 1102 info gebwell fi www gebwell com...

Reviews: