63
CONTROLS
Accessories
IMPORTANT: Follow the procedures
for purging air as instructed by the
attachment manufacturer if specified to
do so.
3. Check for leaks.
High-flow Hydraulic System
(If Equipped)
The High-flow function provides additional
flow to the system to operate attachments
that require more hydraulic flow (EXAMPLE:
Cold planer).
This system can be used only for one-way
flow attachments.
�
Auxiliary hydraulic flow rate and rated
pressure:
Flow Rate ..................
CTL75: 138 L/min (36.3 US gpm)
CTL85: 152 L/min (40.1 US gpm)
Rated Pressure ..........20.6MPa (2987 psi)
1. Connect the attachment hydraulic lines to
ports (a) and (b).
Refer to page 62, “Connecting the
Hydraulic Circuits”.
Some attachments may have a case drain,
which need to be connected to the small
port (T).
2. Turn on the High-Flow switch (E) (green
light is ON).
3. Press the auxiliary hydraulic switch (A) or
slide the slider switch to the left side (A).
Refer to page 81, “Operating the Auxiliary
Hydraulics”.
Note:
Running the high flow hydraulics
for extended periods of time could cause
damage to the hydraulics or other systems
of the machine due to overheating.
To prevent overheating and reduce the risk
of fire, the machine should be cleaned daily.
The standard cooling package is not
permitted for use in high airborne debris
applications such as mulching or land
clearing.
Operating
attachments
in
these
environments could cause the warranty to
be denied.
IMPORTANT: Operation over long periods
with Detent mode switch pressed will
cause the hydraulic oil temperature to rise
and will shorten the life of the hydraulic
units.
T9B018
T9B0151
Summary of Contents for CTL55
Page 1: ...CTL55 CTL65 CTL75 CTL85 Compact Track Loader OPERATOR S MANUAL Revision E 09 10...
Page 6: ...4...
Page 8: ...6...
Page 38: ...SAFETY 36 Safety Signs Decals...
Page 39: ...37 SAFETY Safety Signs Decals...
Page 40: ...SAFETY 38 Safety Signs Decals...
Page 66: ...64 MEMO...
Page 67: ...65 MEMO...
Page 68: ...66 MEMO...
Page 69: ...67 MEMO...
Page 70: ...68...
Page 114: ...MAINTENANCE 112 Maintenance Log Date Hours Service Procedure...
Page 115: ...113 MAINTENANCE Maintenance Log Date Hours Service Procedure...
Page 123: ...121 MEMO...
Page 129: ...127 MEMO...
Page 156: ...154...
Page 170: ...168...
Page 171: ...169 Main Speci cations 170 Machine Dimensions 174 Operating Range 176 SPECIFICATIONS...
Page 176: ...SPECIFICATIONS 174 Machine Dimensions...
Page 178: ...SPECIFICATIONS 176 Operating Range T7K0021 F H C A D B G E...
Page 180: ...178...
Page 181: ...179 General Precautions 180 Air Conditioner CTL55 182 OPTIONS...
Page 193: ...191 MEMO...
Page 194: ...192...
Page 195: ...193 INDEX...