26
917387/BP0310
To prevent unexpected release of the attach-
ment from the hitch, be sure to secure the
latch pins by rotating the levers all the way to the stops.
Power-A-Tach
®
System
Two switches are used to operate the Power-A-Tach System hitch. The Power-A-
Tach switch on the left instrument panel energizes the system. To operate the
Power-A-Tach system, press and hold this switch.
Then with the circuit energized, the Power-A-Tach switch on the right instrument
panel is used to move the latch pins. Press the top of the switch to retract the latch
pins (and disengage the attachment.) Press the bottom of the switch to extend the
latch pines and engage the attachment. (Refer to page 40 for more information.)
To prevent unexpected release of the attachment from
the hitch, be sure the latch pins are secure by verifying
that the pin flags have moved fully to the outside of the hitch.
WARNING
WARNING
Summary of Contents for V270
Page 1: ...Skid Steer Loader Operator s Manual Form No 917387 BP0310 English V270 V270 EU ...
Page 8: ...4 917387 BP0310 Notes ...
Page 22: ...18 917387 BP0310 Notes ...
Page 54: ...50 917387 BP0310 Notes ...
Page 76: ...72 917387 BP0310 Notes ...
Page 84: ...80 917387 BP0310 Notes ...
Page 86: ...82 917387 BP0310 Maintenance Log Date Hours Service Procedure ...
Page 87: ...917387 BP0310 83 Maintenance Log Date Hours Service Procedure ...
Page 88: ...84 917387 BP0310 Maintenance Log Date Hours Service Procedure ...
Page 100: ...96 917345 AP0608 ...