Instr 9926536
Rev 02 2016-08
Page 5 of 6
16. Route controller terminal ring (G) from solar
charger along main vehicle harness (H) and fasten
using Panduit strap
s
.
17. Reconnect battery connections disconnected in
Step 2, connecting solar controller terminal ring
(G) on top of the battery connection.
18. Connect solar panel harness
a
to solar charger
e
.
19. Ensure rear extrusion is free of dust, dirt, and
debris and install decal
t
.
20. Remove cardboard. Check LED to confirm
functional operation. (Ensure solar panel is in
direct sunlight).
21. Reinstall hood and rear deck.