Rev. 00 03/19
OptiFlex Pro B
Decommissioning / Storage
35
Decommissioning / Storage
Decommissioning
1.
End the coating procedure
2.
Switch off the control unit
The adjustments for high voltage, powder output volume and
electrode rinsing air remain stored.
If in disuse for several days
1.
Separate from power mains
2.
Clean guns, injectors and powder hoses (see therefore the
corresponding user manuals)
3.
Turn off the compressed air main supply
Summary of Contents for OptiFlex Pro B
Page 12: ...Rev 00 03 19 12 Safety OptiFlex Pro B ...
Page 34: ...Rev 00 03 19 34 Operation OptiFlex Pro B ...
Page 36: ...Rev 00 03 19 36 Decommissioning Storage OptiFlex Pro B ...
Page 50: ...Rev 00 03 19 50 Fault clearance OptiFlex Pro B ...
Page 54: ...Rev 00 03 19 54 OptiSelect Pro GM04 OptiFlex Pro B ...
Page 62: ...Rev 00 03 19 62 Maintenance Repairs OptiFlex Pro B ...
Page 64: ...Rev 00 03 19 64 Fault clearance OptiFlex Pro B ...
Page 67: ...Rev 00 03 19 OptiFlex Pro B Spare parts list 67 OptiFlex Pro B Spare parts fig 17 ...
Page 75: ...Rev 00 03 19 OptiFlex Pro B Spare parts list 75 Inside back plate fig 23 OptiStar CG21 ...
Page 77: ...Rev 00 03 19 OptiFlex Pro B Spare parts list 77 Connecting material fig 24 ...
Page 88: ...Rev 00 03 19 88 Spare parts list OptiFlex Pro B OptiFlow IG07 spare parts fig 28 ...
Page 90: ...Rev 00 ...