9
SIS-PM / SiS-PM-841 / SIS-PMS User Manual
•
To repeat your event (for example if you want to perform the same events every
day) use the "Loop" button and specify the loop time period in the "Edit loop period"
dialog.
•
After the schedule record has been created, click the "Apply" button to apply the
hardware timer schedule changes. In case of the wrong entries, they will be
highlighted and an error message will appear. Click the "Apply" button again after
correcting all the errors.
Hint: Use the popup menu which can be activated by a right mouse button click on the
table.
The following rules apply for creating a correct schedule:
1.
The event time should not be expired.( Date or time must be a future event)
2.
There should be no duplicate entry with the same parameters.
3.
The total quantity of records should not exceed 16.
4.
The interval between the present time and the latest entry should not exceed 180
days.
5.
The loop period should exceed the interval between the first and the last entry with
at least one minute. If the event time of the first record is after 45 days from the
present time, the loop period should also not exceed the difference between the time
of the first entry and the present time plus 45 days.
6.
Loop period should not exceed 180 days.
7.
It is also possible that the total quantity of the records would be less than 16. Each
loop time interval greater than 11.3 days decreases the maximum quantity of entries
by one.
8.
Without loop the total schedule time interval should not exceed 215 days.
Using the
Switching tasks
dialog you can create the software events schedule:
•
To add a new task, click the "Add" button. The "Add task" dialog will appear. In the
"Add task" dialog, check "Switch ON time" and/or "Switch OFF time" checkboxes and
specify the time to switch the socked on and/or off. If you want the same event to
be performed periodically, check "Perform every" checkbox and specify the time
interval. You can also add remarks about the task in the "Comment" field. To disable
the task, uncheck the "Enabled" checkbox and to enable the task again, re-check the
checkbox.
•
To edit the task, select it and click the "Edit" button or just double click on the task.
•
To remove the task select it and click the "Remove" button. You may select multiple
tasks using ctrl and shift keys. You can also remove all tasks by clicking the "Clear"
button.