SIS-PM / SiS-PM-841 / SIS-PMS  User Manual 

 

To repeat your event (for example if you want to perform the same events every 
day) use the "Loop" button and specify the loop time period in the "Edit loop period" 

dialog.  

 

After the schedule record has been created, click the "Apply" button to apply the 

hardware timer schedule changes. In case of the wrong entries, they will be 
highlighted and an error message will appear. Click the "Apply" button again after 

correcting all the errors.  

Hint: Use the popup menu which can be activated by a right mouse button click on the 

table. 
 

The following rules apply for creating a correct schedule:  

1.

 

The event time should not be expired.( Date or time must be a future event)   

2.

 

There should be no duplicate entry with the same parameters.  

3.

 

The total quantity of records should not exceed 16.  

4.

 

The interval between the present time and the latest entry should not exceed 180 

days.  

5.

 

The loop period should exceed the interval between the first and the last entry with 
at least one minute. If the event time of the first record is after 45 days from the 

present time, the loop period should also not exceed the difference between the time 
of the first entry and the present time plus 45 days.  

6.

 

Loop period should not exceed 180 days.  

7.

 

It is also possible that the total quantity of the records would be less than 16. Each 

loop time interval greater than 11.3 days decreases the maximum quantity of entries 
by one.  

8.

 

Without loop the total schedule time interval should not exceed 215 days.  

 
Using the 

Switching tasks

 dialog you can create the software events schedule:  

 

To add a new task, click the "Add" button. The "Add task" dialog will appear. In the 
"Add task" dialog, check "Switch ON time" and/or "Switch OFF time" checkboxes and 

specify the time to switch the socked on and/or off. If you want the same event to 
be performed periodically, check "Perform every" checkbox and specify the time 

interval. You can also add remarks about the task in the "Comment" field. To disable 
the task, uncheck the "Enabled" checkbox and to enable the task again, re-check the 

checkbox.  

 

To edit the task, select it and click the "Edit" button or just double click on the task.  

 

To remove the task select it and click the "Remove" button. You may select multiple 

tasks using ctrl and shift keys. You can also remove all tasks by clicking the "Clear" 
button.  

Summary of Contents for Silver Shield Power Manager

Page 1: ...a ag ge er r S Si il lv ve er r S Sh hi ie el ld d P Po ow we er r M Ma an na ag ge er r 8 84 41 1 S Si il lv ve er r S Sh hi ie el ld d P Po ow we er r M Ma an na ag ge er r S S W Wi it th h b bu ui...

Page 2: ...3 Side panel with connectors of the SiS PM 841 4 Hardware requirements 5 Package contents 6 Installation of SiS PM S 7 Connection of other devices to the SiS PM S 8 Switching SiS PM S on and off conn...

Page 3: ...hardware based event time schedule The hardware schedule will work even with the managing computer switched off provided that the is connected to the optional power adapter The unit will keep performi...

Page 4: ...cker switch Indicator Socket 3 Silence button to suppress beeps Indicator POWER USB connector Non manageable socket Indicator Socket 4 Hardware schedule power supply connector 9VDC 0 5A For SIS PM onl...

Page 5: ...allow hardware schedule of SiS PM events to continue working with the managing computer switched off an extra power adapter 9VDC 0 5 is required optional SiS PMS contains the build in power adapter 5...

Page 6: ...for SiS PM only The sockets Socket 1 Socket 2 Socket 3 and Socket 4 can be managed or preprogrammed by computer via the USB interface SiS PM S can be used with other multi plugs and or surge protector...

Page 7: ...et has power to it SiS PM 841 sockets can be controlled by PC and by other external device which can support PM interface in particular CAS 441 PM CAS 841 PM Supervisory external device can read statu...

Page 8: ...t the program which will be launched when the power supply to the socket does not match the required event i e the socket must be on but there is no power supplied to it yet Check the When alarm goes...

Page 9: ...om the present time the loop period should also not exceed the difference between the time of the first entry and the present time plus 45 days 6 Loop period should not exceed 180 days 7 It is also po...

Page 10: ...to for files using the Browse button or typing it manually in the Title and Path name fields Specify the File name mask using wildcard characters After you have specified the folder and file name chec...

Page 11: ...following command line interface syntax is supported pm exe on off device name socket name Examples C Program Files Gembird Power Manager pm exe on sis pm socket1 E Utils PM3 pm exe off my sis pm tab...

Page 12: ...h the sign Indicator Socket x is on means there is power in this particular socket Main rocker switch is light up means SiS PM S is connected to the power supply and the SiS PM S is active 12 Technica...

Page 13: ...www gmb nl forum Disclaimer No effort have been spared to ensure that the information in this manual is correct and complete to the best of our knowledge However no liability is accepted for any erro...

Reviews: