Edificio Genebre. Av. de Joan Carles I, 46-48
08908 L'Hospitalet de Llobregat. Barcelona (Spain)
genebre@genebre.es - www.genebre.es
GENEBRE S.A.
FECHA DE REVISIÓN: 16/03/2020 NUMERO DE REVISIÓN: 1
5
Figure 1
6. Positioner Mounting
•
Reserve the space for maintenance routines and tasks.
Safety instructions on chapter 3 must be observed. Work on electrical system or
equipment must only be carried out by skilled electrician.
VERY IMPORTANT NOTICE: Follow these instructions carefully to avoid
damage.
A-
1 Cover
B-
1 Plastic column
C-
1 DPS positioner PCB
D-
2 Sheet metal Fixing screws
E-
1 Plastic Fixing screw