INSTALLATION ASSISTANT
Interconnect System Self Test Feature
(follow the on-screen
prompts).
Upon power up, this controller will go through a system self test
which will check for the presence of utility voltage on the DC
circuits. This is done to prevent damage if the installer mistakenly
connects AC utility power sense wires into the DC terminal block.
If utility voltage is detected, the controller will display a warning
message and lock out the generator, preventing damage to the
controller. Power to the controller must be removed to clear this
warning.
Utility voltage must be turned on and present at the N1 and N2
terminals inside the generator control panel for this test to be
performed and pass.
NOTE:
DAMAGE CAUSED BY MISWIRING OF THE INTERCONNECT
WIRES IS NOT WARRANTABLE!
This test will be performed each time the controller is powered
up.
Upon first power up of the generator, the display interface will
begin an installation assistant. The assistant will prompt the user
to set the minimum settings to operate. These settings are simply:
Current Date/Time and Exercise Day/Time. The maintenance inter-
vals will be initialized when the exercise time is entered.
The exercise settings can be changed at any time via the "EDIT"
menu (see Appendix, "Menu System").
If the 12 volt battery is disconnected or the fuse removed, the
Installation Assistant will operate upon power restoration. The
only difference is the display will only prompt the customer for the
current Time and Date.
IF THE INSTALLER TESTS THE GENERATOR PRIOR TO
INSTALLATION, PRESS THE “ENTER” KEY TO AVOID SETTING
UP THE EXERCISE TIME. THIS WILL ENSURE THAT WHEN
THE CUSTOMER POWERS UP THE UNIT, HE WILL STILL BE
PROMPTED TO ENTER AN EXERCISE TIME.
SETTING THE EXERCISE TIMER
This generator is equipped with an exercise timer. Once it is set,
the generator will start and exercise every seven days, on the day
of the week and at the time of day specified. During this exercise
period, the unit runs for approximately 12 minutes and then shuts
down. Transfer of loads to the generator output does not occur
during the exercise cycle unless utility power is lost.
LOW SPEED EXERCISE
The standard start sequence will be initiated.
• All 1800 rpm units will exercise at 1400 RPM
• All 3600 rpm units will exercise at 1800 RPM
If utility is lost during exercise the controller will do the following:
• Wait for the “line interrupt period” for utility to return. If utility
returns within the “line interrupt period”, continue to exercise
at low RPM.
• If utility is still lost after the “line interrupt period”, run the engine
up to normal RPM and transfer the load. At this time the con-
troller will exit the exercise routine and assume full automatic
operation.
USER ADJUSTABLE SETTINGS
Setting
Factory
Default
Minimum
Setting
Maximum
Setting
Increment
Exercise
time
2 pm
00:00 (12 am)
23:59
(11:59 pm)
1 min
Exercise
day
Wed
Sun
Sat
1 day
Current
Time
12 am
00:00 (12 am)
23:59
(11:59 pm)
1 min
Current
Day
Sun
Sun
Sat
1 day
Current
Month
Jan
Jan
Dec
1 month
Current
Year
2008
2008
2100
1 year
Language
English
French
Spanish
N/A
Contrast
80%
0%
100%
1%
FUEL CONVERSION
For fuel conversion steps, refer to the GenSpec section,
RECONFIGURING THE FUEL SYSTEM.
OPERATION
This system is intended to supply standby power in the event of a
utility failure. The control system will monitor the utility voltage to
determine if stand-by power is required. Should the utility voltage
fail, the generator will start and run normally, detaching from the
utility and supplying the customer load from the generator. When
utility power returns, the controller will re-transfer the customer
load back to utility and shut down the generator.
AUTOMATIC TRANSFER OPERATION
To select automatic operation, do the following:
1. Make sure the transfer switch main contacts are set to their
UTILITY position, i.e., loads connected to the utility power
source.
2. Be sure that normal UTILITY power source voltage is avail-
able to transfer switch terminal lugs N1 and N2 (Refer to the
Electrical Data section).
3. Set the generator’s AUTO/OFF/MANUAL switch to AUTO.
4. Set the generator’s main circuit breaker to its ON (or CLOSED)
position.
With the preceding steps complete, the generator will start auto-
matically when utility source voltage drops below a preset level.
After the unit starts, loads are transferred to the standby power
source. Refer to the Sequence of Automatic Operation section.
8-3
CntrlNexus001 Rev
. E 12/11
Control Panel
Summary of Contents for 48kW
Page 29: ...Notes ...
Page 30: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 42: ......
Page 44: ......
Page 46: ......
Page 48: ......
Page 49: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 56: ......
Page 58: ......
Page 60: ......
Page 62: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ...Notes ...
Page 79: ...Notes ...
Page 80: ...BackPg001 Rev A 04 07 ...
Page 109: ...Stationary Emergency Generator Notes ...
Page 110: ......
Page 112: ......
Page 114: ......
Page 116: ......
Page 117: ......
Page 119: ......
Page 120: ......
Page 121: ......
Page 122: ......
Page 123: ......
Page 128: ......
Page 130: ......
Page 132: ......
Page 134: ......
Page 136: ......
Page 137: ......
Page 138: ......
Page 139: ......
Page 140: ......
Page 141: ......
Page 142: ......
Page 143: ......
Page 144: ......
Page 145: ......
Page 146: ......
Page 147: ......
Page 148: ......
Page 149: ......
Page 150: ...BackPg001 Rev A 04 07 ...