Installation
6
Automatic Transfer Switch Owner’s Manual
Install Breakers
1.
. Insert tab on each breaker (A) into
the hook on the bus (B). Push the breaker into the
bus until it snaps into place.
Figure 2-2. Install Breakers
Installing Branch Circuit Conductors
1.
Install properly sized branch circuit conductors into
the transfer switch through the knockouts provided.
Additional knockouts can be made in the field as
needed.
2.
Connect the ungrounded branch circuit conductors
(hot conductors) to a properly sized circuit breaker
approved for use with the transfer switch.
3.
Terminate the neutral conductor and equipment
grounding conductor of the branch circuit at the
neutral/equipment ground terminal bars.
4.
Size all conductors, raceways, conduits, and
junction boxes, if required, to the applicable NEC
code articles and follow the NEC installation
requirements for the wiring method(s) selected.
NOTE:
Multi-wire branch circuits must be installed in
accordance with NEC Article 210.4.
Connecting Power Source and
Generator Power Supply
Installation and interconnection diagrams are provided in
this manual.
NOTE:
All installations must comply with national, state
and local codes. It is the responsibility of the installer to
perform an installation that will pass the final electrical
inspection.
1.
Connect utility supply at the utility service
disconnect circuit breaker terminals N1 and N2.
2.
Connect utility neutral and ground to the Load
Center Neutral and Ground terminals. Neutral and
Ground terminals on the Load Center are bonded
to each other with a jumper wire.
3.
Connect loads to the Integrated Load Center with
customer-supplied circuit breakers.
4.
and
. Connect generator
to the generator terminals (E1 and E2) on the
transfer mechanism.
Figure 2-3. Wiring Connections
5.
Connect the generator neutral wire to the top
neutral lug or side lugs on the panelboard.
6.
Connect neutral conductors to the lugs and
terminals along the neutral/ground bars in the
panelboard section of the transfer switch.
7.
Connect a maximum 200A subpanel supply to
lower T1 and T2 connections of 8-position Load
Center Terminals. Connect subpanel Neutral and
Ground to subpanel Neutral and Ground bars.
8.
Connect grounding electrode conductors to the
neutral / ground terminal bars in the panelboard
portion of the switch.
000362
B
A
Electrocution. Turn utility and emergency
power supplies to OFF before connecting
power source and load lines. Failure to do so
will result in death or serious injury.
(000116)
DANGER
N2
E2
T2
A
T1
N1
E1
004982
Summary of Contents for RXSW200A3F
Page 4: ...iv Automatic Transfer Switch Owner s Manual This page intentionally left blank ...
Page 8: ...Safety 4 Automatic Transfer Switch Owner s Manual This page intentionally left blank ...
Page 14: ...Installation 10 Automatic Transfer Switch Owner s Manual This page intentionally left blank ...
Page 27: ......