GENEREX SYSTEMS Computervertriebsgesellschaft mbH - www.generex.de - 28
GENEREX Systems Inc. - www.generex.us
BACS Monitor displays the system status according
to your configuration.
Indicated colours after startup:
BACS module initialized an ready for operation
BACS module not available
BACS module not queried or initialized
After successful initialization, the BACS status page
will be displayed with the voltage and temperature of
the batteries, the equalization power and the status
of the LEDs.
After approximately 15 minutes, the first measure-
ment of the impedance is performed.
Wait until the first RI measurement has been carried
out before continuing with chapter
BACS Module & Alarm Threshold Setting
6. First BACS startup sequence
BACS system status: 2 strings and 40 modules.
For more information and operating instructions, please refer the BACS User Manual.