24
Eng
lis
h
4
Check if the city power is connected to the terminals of "
230V INPUT POWER
"
in the control panel and that there is voltage. Power will pass through the
generator and go out through "
230V OUTPUT POWER
".
5
Place the
“ATS SELECTOR” switch to “ON” (automatic mode).
The generator is alert and ready to start after a network failure.
To verify the correct operation provoke a power failure in "
POWER 230 V INPUT
."
The generator will initiate the startup process and it will start. Once started the
230V power will be restored in “POWER OUTPUT” thanks to the power of the
generator.
If you have any doubts contact us at
sat@sg-group.es
OUTPUT POWER 230V
INPUT POWER 230V