Section 3 • Scheduled Maintenance Procedures
3 - 18
GR-20J • GR-26J
Part No. 227656
September 2016
CHECKLIST
B
PROCEDURES
B-10
Test the Flashing Beacon
(if equipped)
Genie specifications require that this procedure be
performed every 250 hours or quarterly, whichever
comes first.
Flashing beacon is used to alert operators and
ground personnel of machine proximity and
motion.
1 Turn the key switch to ground control and pull
out the red Emergency Stop button to the on
position at both the ground and platform
controls.
Note: Rotate the red Emergency Stop button at
platform control one quarter turn in a clockwise
direction to restore the power supply. The red
Emergency Stop button returns automatically to
the out, or on position.
2 Activate any machine function from the ground
control (as indicated on the ground control box).
Result: The beacon should flash.
3 Turn the key switch to platform controls.
4 Activate any machine function from the platform
control (as indicated on the platform control
box).
Result: The beacon should flash.
Note: Beacon will flash only when you activate any
machine function either from ground control or
platform control.