Part No. 46281
Genie GS-2032 & GS-2632 & GS-2046 & GS-2646 & GS-3246
13
Operator's Manual
First Edition • Seventeenth Printing
PRE-OPERATION INSPECTION
Pre-operation Inspection
o
Be sure that the operator's, safety and
responsibilities manuals are complete, legible
and in the storage container located on the
platform.
o
Be sure that all decals are legible and in place.
See Decals section.
o
Check for hydraulic oil leaks and proper oil level.
Add oil if needed. See Maintenance section.
o
Check for battery fluid leaks and proper fluid
level. Add distilled water if needed. See
Maintenance section.
Check the following components or areas for
damage, modifications and improperly installed or
missing parts:
o
Electrical components, wiring and electrical
cables
o
Hydraulic power unit, tank, hoses,
fittings, cylinders and manifolds
o
Battery pack and connections
o
Drive motors
o
Wear pads
o
Tires and wheels
o
Limit switches, alarms and horn
o
Nuts, bolts and other fasteners
o
Platform entry chain (if equipped)
o
Platform entry gate (if equipped)
o
Beacon and alarms (if equipped)
o
Brake release components
o
Safety arm
o
Pothole guards
o
Platform extension
o
Scissor pins and retaining fasteners
o
Platform control joystick
o
Generator (if equipped)
o
Counterweight (if equipped)
Check entire machine for:
o
Cracks in welds or structural components
o
Dents or damage to machine
o
Be sure that all structural and other critical
components are present and all associated
fasteners and pins are in place and properly
tightened.
o
Side rails are installed and bolts are fastened
o
Be sure that the chassis trays are in place,
latched and properly connected.