Section 3 • Scheduled Maintenance Procedures
REV B
November 2008
3 - 34
GS-2668 RT • GS-3268 RT
Part No. 112657
CHECKLIST
E
PROCEDURES
12 Remove the hydraulic tank from the machine.
13 Remove the suction strainers and clean them
using a mild solvent.
14 Clean the inside of the hydraulic tank using a
mild solvent.
15 Install the suction strainers using thread sealer
on the threads.
16 Install the drain plug using thread sealer on the
threads.
17 Install the hydraulic tank, tank strap and tank
strap retaining fasteners.
18 Install the return filter hose onto the filter head.
19 Install the suction hoses onto the tank.
20 Fill the tank with hydraulic oil until the fluid is
within the top 2 inches / 5 cm of the sight
gauge. Do not overfill.
21 Clean up any oil that may have spilled. Properly
discard the oil.
22 If equipped, open the two hydraulic shutoff
valves located at the hydraulic tank.
23 Operate all machine functions through a full
cycle and check for leaks.
24 Install the hose cover plate and install the hose
cover plate mounting fasteners.
E-2
Perform Engine Maintenance -
Perkins Models
Engine specifications require that this procedure
be performed every 2000 hours.
Required maintenance procedures and additional
engine information is available in the
Perkins 403D-11 User's Handbook
(Perkins part number SEBU8311-01) OR the
Perkins 403C-11 User's Handbook
(Perkins part number 100816460).
Perkins 403D-11 User's Handbook
Genie part number
131661
Perkins 403C-11 User's Handbook
Genie part number
97360
Summary of Contents for GS-2668 RT
Page 4: ...June 2007 GS 2668 RT GS 3268 RT Part No 112657 iv This page intentionally left blank ...
Page 14: ...June 2007 GS 2668 RT GS 3268 RT Part No 112657 xiv This page intentionally left blank ...
Page 184: ... from serial number GS6805 44771 Part No 112657 Rev C2 Service Manual GS 2668 RT GS 3268 RT ...