Section 3 • Scheduled Maintenance Procedures
November 2014
3 - 2
GS-2669 RT • GS-3369 RT • GS-4069 RT
Part No. 229753
Maintenance Symbols Legend
Note: The following symbols have been used in
this manual to help communicate the intent of the
instructions. When one or more of the symbols
appear at the beginning of a maintenance
procedure, it conveys the meaning below.
Indicates that tools will be required to
perform this procedure.
Indicates that new parts will be required
to perform this procedure.
Indicates that a cold engine will be
required to perform this procedure.
Indicates that a warm engine will be
required to perform this procedure.
Indicates that dealer service will be
required to perform this procedure.
Pre-delivery Preparation Report
The pre-delivery preparation report contains
checklists for each type of scheduled inspection.
Make copies of the
Pre-delivery Preparation
report
to use for each inspection. Store completed forms
as required.
Maintenance Schedule
There are five types of maintenance inspections
that must be performed according to a schedule—
daily, quarterly, semiannually, annually, and
two year. The
Scheduled Maintenance Procedures
Section and the Maintenance Inspection Report
have been divided into five subsections—A, B, C,
D, and E. Use the following chart to determine
which group(s) of procedures are required to
perform a scheduled inspection.
Inspection
Checklist
Daily or every 8 hours
A
Quarterly or every 250 hours
A + B
Semiannually or every 500 hours
A + B + C
Annually or every 1000 hours
A + B + C + D
Two year or every 2000 hours
A + B + C + D + E
Maintenance Inspection Report
The maintenance inspection report contains
checklists for each type of scheduled inspection.
Make copies of the
Maintenance Inspection Report
to use for each inspection. Maintain completed
forms for a minimum of 4 years or in compliance
with your employer, jobsite and governmental
regulations and requirements.
SCHEDULED MAINTENANCE PROCEDURES
Summary of Contents for GS-2669 RT
Page 169: ...Section 6 Schematics November2014 6 9 Control Panel Circuit Diagram 6 10 ...
Page 235: ...Section 6 Schematics November2014 6 75 6 76 Electrical Schematic GS 4069 RT Gas LPG Models AS ...
Page 238: ...November2014 Section 6 Schematics 6 78 Electrical Schematic GS 4069 RT Gas LPG Models AS 6 77 ...
Page 243: ...Section 6 Schematics November2014 6 83 Electrical Schematic GS 4069 RT Diesel Models AS 6 82 ...
Page 246: ...November2014 Section 6 Schematics 6 86 Electrical Schematic GS 4069 RT Diesel Models AS 6 85 ...
Page 251: ...Section 6 Schematics November2014 6 91 Electrical Schematic GS 4069 RT Gas LPG Models CE 6 92 ...
Page 254: ...November2014 Section 6 Schematics 6 94 Electrical Schematic GS 4069 RT Gas LPG Models CE 6 93 ...
Page 259: ...Section 6 Schematics November2014 6 99 6 100 Electrical Schematic GS 4069 RT Diesel Models CE ...
Page 267: ...Section 6 Schematics November2014 6 107 Hydraulic Schematic GS 2669 RT and GS 3369 RT 6 108 ...
Page 270: ...November2014 Section 6 Schematics 6 110 Hydraulic Schematic GS 4069 RT 6 109 ...