Section 3 • Scheduled Maintenance Procedures
November 2014
Part No. 229753
GS-2669 RT • GS-3369 RT • GS-4069 RT
3 - 23
CHECKLIST
B
PROCEDURES
B-10
Test the Drive Speed -
Stowed Position
Genie requires that this procedure be performed
every 250 hours or quarterly, whichever comes
first.
Proper drive function movement is essential to safe
machine operation. The drive function should
respond quickly and smoothly to operator control.
Drive performance should also be free of
hesitation, jerking and unusual noise over the
entire proportionally controlled speed range.
1 Create start and finish lines by marking two lines
on the ground 40 feet / 12.2 m apart.
2 Turn the key switch to platform controls and pull
out the red Emergency Stop button to the on
position at both the ground and platform
controls.
3 Start the engine from the platform controls.
4 Lower the platform to the stowed position.
5 Choose a point on the machine; i.e., contact
patch of a tire, as a visual reference for use
when crossing the start and finish lines.
6 Bring the machine to maximum forward drive
speed before reaching the start line. Begin
timing when your reference point on the
machine crosses the start line.
7 Continue at full speed and note the time when
the machine reference point passes over the
finish line. Refer to Section 2,
Specifications.
8 Bring the machine to maximum reverse drive
speed before reaching the start line. Begin
timing when your reference point on the
machine crosses the start line.
9 Continue at full speed and note the time when
the machine reference point passes over the
finish line. Refer to Section 2,
Specifications.
Summary of Contents for GS-2669 RT
Page 169: ...Section 6 Schematics November2014 6 9 Control Panel Circuit Diagram 6 10 ...
Page 235: ...Section 6 Schematics November2014 6 75 6 76 Electrical Schematic GS 4069 RT Gas LPG Models AS ...
Page 238: ...November2014 Section 6 Schematics 6 78 Electrical Schematic GS 4069 RT Gas LPG Models AS 6 77 ...
Page 243: ...Section 6 Schematics November2014 6 83 Electrical Schematic GS 4069 RT Diesel Models AS 6 82 ...
Page 246: ...November2014 Section 6 Schematics 6 86 Electrical Schematic GS 4069 RT Diesel Models AS 6 85 ...
Page 251: ...Section 6 Schematics November2014 6 91 Electrical Schematic GS 4069 RT Gas LPG Models CE 6 92 ...
Page 254: ...November2014 Section 6 Schematics 6 94 Electrical Schematic GS 4069 RT Gas LPG Models CE 6 93 ...
Page 259: ...Section 6 Schematics November2014 6 99 6 100 Electrical Schematic GS 4069 RT Diesel Models CE ...
Page 267: ...Section 6 Schematics November2014 6 107 Hydraulic Schematic GS 2669 RT and GS 3369 RT 6 108 ...
Page 270: ...November2014 Section 6 Schematics 6 110 Hydraulic Schematic GS 4069 RT 6 109 ...