Section 3 • Scheduled Maintenance Procedures
November 2014
Part No. 229753
GS-2669 RT • GS-3369 RT • GS-4069 RT
3 - 29
Checklist C Procedures
C-1
Test the Platform Overload
System (if equipped)
Genie specifications require that this procedure
be performed every 500 hours or six months,
whichever comes first OR when the machine fails
to lift the maximum rated load.
Testing the platform overload system regularly is
essential to safe machine operation. Continued
use of an improperly operating platform overload
system could result in the system not sensing an
overloaded platform condition. Machine stability
could be compromised resulting in the machine
tipping over.
1 Disconnect the platform controls from the
machine at the platform.
2 Open the side covers at the ground controls side
of the machine.
3 Locate the Electronic Control Module (ECM) wire
harness 6 pin connector to platform controls
connection below and behind the control box.
4 Securely connect the platform controls to the
ECM wire harness.
5 Tag and disconnect the platform controls wire
harness from the ECM wire harness.
6 Securely connect the platform controls to the
ECM wire harness..
7 Turn the key switch to platform control and pull
out the red Emergency Stop button to the on
position at both the ground and platform
controls. Start the machine.
8 Raise the platform approximately 10 feet / 3 m.
9 Lift the safety arm and move it to the center of
the linkage and rotate to a vertical position.
10 Lower the platform onto the safety arm.
11 Turn the machine off.
12 Locate and remove the maximum height limit
switch from the lower slider channel and set
aside.
Note: Do not disconnect the limit switch harness.
a
maximum height limit switch
a
Summary of Contents for GS-2669 RT
Page 169: ...Section 6 Schematics November2014 6 9 Control Panel Circuit Diagram 6 10 ...
Page 235: ...Section 6 Schematics November2014 6 75 6 76 Electrical Schematic GS 4069 RT Gas LPG Models AS ...
Page 238: ...November2014 Section 6 Schematics 6 78 Electrical Schematic GS 4069 RT Gas LPG Models AS 6 77 ...
Page 243: ...Section 6 Schematics November2014 6 83 Electrical Schematic GS 4069 RT Diesel Models AS 6 82 ...
Page 246: ...November2014 Section 6 Schematics 6 86 Electrical Schematic GS 4069 RT Diesel Models AS 6 85 ...
Page 251: ...Section 6 Schematics November2014 6 91 Electrical Schematic GS 4069 RT Gas LPG Models CE 6 92 ...
Page 254: ...November2014 Section 6 Schematics 6 94 Electrical Schematic GS 4069 RT Gas LPG Models CE 6 93 ...
Page 259: ...Section 6 Schematics November2014 6 99 6 100 Electrical Schematic GS 4069 RT Diesel Models CE ...
Page 267: ...Section 6 Schematics November2014 6 107 Hydraulic Schematic GS 2669 RT and GS 3369 RT 6 108 ...
Page 270: ...November2014 Section 6 Schematics 6 110 Hydraulic Schematic GS 4069 RT 6 109 ...