Fundamentals
It is the responsibility of the dealer to perform the
Pre-delivery Preparation.
The Pre-delivery Preparation is performed prior
to each delivery. The inspection is designed to
discover if anything is apparently wrong with a
machine before it is put into service.
A damaged or modified machine must never be
used. If damage or any variation from factory
delivered condition is discovered, the machine
must be tagged and removed from service.
Repairs to the machine may only be made by
a qualified service technician, according to the
manufacturer's specifications.
Scheduled maintenance inspections shall be
performed by qualified service technicians,
according to the manufacturer's specifications
and the requirements listed in the responsibilities
manual.
Terex South Dakota, Inc USA
500 Oak Wood Road
PO Box 1150
Watertown, SD 57201-6150
(605) 882-4000
Genie UK
The Maltings, Wharf Road
Grantham, Lincolnshire
NG31- 6BH England
(44) 1476-584333
Copyright © 2011 Terex Corporation. Genie® is a registered trademark of Terex South
Dakota, Inc. 133192 Rev D
Instructions
Use the operator’s manual on your machine.
The Pre-delivery Preparation consists of
completing the Pre-operation Inspection, the
Maintenance items and the Function Tests.
Use this form to record the results. Place a
check in the appropriate box after each part is
completed.
Follow the instructions in the operator’s manual.
If any inspection receives an N, remove the
machine from service, repair and reinspect it. After
repair, place a check in the R box.
Legend
Y = yes, completed
N = no, unable to complete
R = repaired
Comments
Pre-Delivery Preparation
Y
N
R
Pre-operation inspection
completed
Maintenance items
completed
Function tests completed
Model
Serial number
Date
Machine owner
Inspected by (print)
Inspector signature
Inspector title
Inspector company
Pre-Delivery Preparation