May 2008
Section 7 - Repair Procedures
Document 57.4403.4200
GTH-4013 SX GTH-4017 SX 1
7.1 TIME
SCHEDULE
Job Operators
Expected
needed time
(h)
change the ignition key
1
1,30
change the speed selector
1
1,00
change the lights and horn selector
1
1,00
change the overload warning system display
1
1,00
re-calibrate the 3B6 system
1
1,00
change the load cell
1
2,00
change the overload warning system display and calibrate
1
1,00
change the joystick levers
1
1,00
change the joystick movement switch pushbutton
1
1,00
change the brake pump
1
1,30
change the low boom micro-switch
1 0,30
change the high boom micro-switch
1
0,30
change the boom lifting cylinder
2
2,15 cad.
change the boom lifting cylinder kit
(complete overhaul)
1
2,00
change the block valve of the boom lifting cylinder
1
1,00
change the cylinder inside the boom
2
2,50 cad.
change the extension cylinder kit inside the boom
1
2,30
change the block valve of the extension cylinder
inside the boom
1
1,00
change the extension cylinder on the boom
2
1,00 cad.
change the extension cylinder kit on the boom
1
1,30
change the valve of the extension cylinder on the boom
1
0,30
change the re-sequencing valve of the
extension cylinder inside the boom
1
2,30
change the re-sequencing valve of the
extension cylinder on the boom
1
2,30
change the fork pitching cylinder
1
1,30
change the fork pitching cylinder kit
1
1,30
change the valve of the fork pitching cylinder
1
0,30
change locking fork cylinder
1
1,00
change locking fork cylinder kit
1
1,30
change block valve of the attachment locking cylinder
1
1,00
change the outrigger up/down movement cylinder
1
1,30
change the outrigger up/down movement cylinder kit
1
1,30
Repair Procedures