Part No. 1268494
S-100 • S-105 • S-120 • S-125
3 - 61
March 2017
Section 3 • Repair Procedures
GROUND CONTROLS
5 Carefully remove the membrane decal from the
control box lid while guiding the ribbon cables
out of the control box lid.
6 Remove any decal adhesive from the control
box lid with a mild solvent.
Note: Do not allow any solvent to come in contact
with the LCD display screen.
7 Install the new membrane decal (Genie part
number 50811) while guiding the ribbon cables
through the control box lid.
8 Connect the ribbon cables to the ECM circuit
board.
9 Close the control box lid and install the retaining
fasteners.
7-3
Control Relays
Relays used for single function switching are single
pole double throw (SPDT) relays.
How to Test a Single Pole Double
Throw Relay
Electrocution/burn hazard. Contact
with electrically charged circuits
could result in death or serious
injury. Remove all rings, watches
and other jewelry.
Component damage hazard.
Electrostatic discharge (ESD)
can damage printed circuit board
components. Maintain firm contact
with a metal part of the machine
that is grounded at all times when
handling printed circuit boards OR
use a grounded wrist strap.
1 Turn the key switch to the
off
position.
2 Open the ground control box and remove the
relay to be tested from the ECM circuit board.
Summary of Contents for S-100
Page 246: ...March 2017 Section 6 Schematics 6 22 Safety Circuit Schematic 6 21 ...
Page 259: ...Section 6 Schematics March 2017 6 35 6 36 Electrical Schematic Generator Options ...
Page 262: ...March 2017 Section 6 Schematics 6 38 6 37 Electrical Schematic 12 kW Generator welder option ...
Page 264: ...March 2017 Section 6 Schematics 6 40 Perkins 1104D 44T Engine Electrical Schematic 6 39 ...
Page 265: ...Section 6 Schematics March 2017 6 41 Perkins 854F 34T Engine Electrical Schematic 6 42 ...
Page 268: ...March 2017 Section 6 Schematics 6 44 Perkins 854F 34T Engine Harness 6 45 ...
Page 269: ...Section 6 Schematics March 2017 6 45 Deutz TD2011L04i Engine Electrical Schematic 6 46 ...
Page 271: ...Section 6 Schematics March 2017 6 47 Deutz TD2 9 Engine Electrical Schematic 6 48 ...
Page 274: ...March 2017 Section 6 Schematics 6 50 Deutz TD2 9 Engine Electrical Harness 6 51 ...
Page 276: ...March 2017 Section 6 Schematics 6 52 6 53 Hydraulic Schematic 12 kW Generator welder option ...