3 - 42
S-60 • S-65 • S-60 TRAX • S-65 TRAX
Part No. 147753
S-60 HC • S-60X • S-60XC
December 2013
Section 3 • Scheduled Maintenance Procedures
C-1
Perform Engine Maintenance -
Deutz Models
Engine specifications require that this procedure be
performed every 500 hours.
Proper engine maintenance, following the engine
manufacturer's maintenance schedule, is essential
to good engine performance and service life. Failure
to perform the maintenance procedures can lead to
poor engine performance and component damage.
Required maintenance procedures and additional
engine information are available in the
Deutz 2011 Series Operation Manual
(Deutz part number 0312-3547).
Deutz 2011 Series Operation Manual
Genie part number
139320
Checklist C Procedures
C-2
Grease the Platform Overload
Mechanism (if equipped), S-60,
S-65, S-60 TRAX and S-65 TRAX
Genie specifications require that this procedure be
performed every 500 hours or six months,
whichever comes first. Perform this procedure more
often if dusty conditions exist.
Application of lubrication to the platform overload
mechanism is essential to safe machine operation.
Continued use of an improperly greased platform
overload mechanism could result in the system not
sensing an overloaded platform condition and will
result in component damage.
1 Locate the grease fittings on each pivot pin of
the platform overload assembly.
2 Thoroughly pump grease into each grease
fitting.
Grease Specification
Chevron Ultra-duty grease, EP NLGI 2 (lithium based)
or equivalent
Summary of Contents for S-60 HC
Page 1: ......
Page 215: ...Section 6 Schematics December2013 6 7 Ford DSG 423 Engine Wire Harness 6 8 ...
Page 218: ...December2013 Section 6 Schematics 6 10 Ford MSG 425 Engine Wire Harness 6 9 ...
Page 219: ...Section 6 Schematics December2013 6 11 Electrical Schematic Options All Models 6 12 ...
Page 222: ...December2013 Section 6 Schematics 6 14 Wiring Diagram Belt Driven Generator 6 13 ...
Page 223: ...Section 6 Schematics December2013 6 15 Wiring Diagram 3kW Hydraulic Generator 6 16 ...
Page 234: ...December2013 Section 6 Schematics 6 26 Hydraulic Schematic 2WD Models after SN 21396 6 25 ...
Page 238: ...December2013 Section 6 Schematics 6 30 Hydraulic Schematic 4WD Models after SN 21396 6 29 ...
Page 365: ...Section 6 Schematics December2013 6 157 Electrical Schematic S 60 HC CE 6 158 ...
Page 368: ...December2013 Section 6 Schematics 6 160 Chassis Wiring Diagram S 60 HC CE 6 159 ...
Page 373: ...Section 6 Schematics December2013 6 165 Platform Control Box Wiring Diagram S 60 HC CE 6 166 ...
Page 461: ......