background image

BLIZZARD  500-900 

532102        -  Rev.B

Tr

ansla

tion of the original instruc

tions

ENGLISH

EU DECLARATION OF CONFORMITY

The Manufacturer

Company name:

FAAC S.p.A. Soc. Unipersonale

Address:

Via Calari, 10 - 40069 Zola Predosa BOLOGNA - ITALY

hereby declares under his sole responsibility that the following product:

Description:

Gear motor for sliding gates

Model:

BLIZZARD 500; BLIZZARD 900.

Complies with the following relevant Union harmonization legislations:

2014/30/EU
2011/65/EU

Furthermore, the following harmonised standards have been applied:

EN61000-6-2:2005
EN61000-6-3:2007 + A1:2011

Bologna, Italy, 06-12-2018

CEO
A. Marcellan

CONTENTS

1.  INTRODUCTION TO THIS INSTRUCTION MANUAL

  . . . . . . . . . .

4

1.1  Meaning of Symbols Used

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

4

2. SAFETY RECOMMENDATIONS

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5

2.1 Installer safety

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5

2.2  Transport and storage

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5

2.3  Unpacking and handling

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6

2.4  Disposal of the product

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6

3. BLIZZARD 500-900

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6

3.1 Intended use

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6

3.2  Limitations of use

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6

3.3 Prohibited uses

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6

3.4 Emergency Use

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7

3.5 Product Warnings

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7

3.6 Product Identification

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7

3.7 Technical Characteristics

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7

3.8 Component Identification

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8

3.9 Dimensions

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8

4. INSTALLATION REQUIREMENTS

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9

4.1 Mechanical Requirements

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9

4.2 Electrical System

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9

4.3 Example System

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

10

5. INSTALLATION

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

10

5.1 Tools Required

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

10

5.2 Installation Dimensions

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

11

5.3 Base plate

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

12

5.4  Fastening the Gear Motor

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

12

5.5 Manual Operation

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

13

5.6  Installing the Rack

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

13

5.7  Adjustments and Checks

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

16

6. START-UP

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

17

6.1  Power supply and grounding

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

17

6.2  Installation of the Limit Switches

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

17

6.3 Final Operations

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

18

7. MAINTENANCE

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

18

7.1 Scheduled Maintenance

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

19

8.  INSTRUCTIONS FOR USE

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

20

8.1 Safety recommendations

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

20

8.2 Product Warnings

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

20

8.3 Emergency Use

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

20

8.4 Manual Operation

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

20

DECLARATION OF INCORPORATION FOR PARTLY 
COMPLETED MACHINERY

(2006/42/EC ANNEX II P.1, B)

Manufacturer and person authorised to draft the applicable technical documentation

Company name:

FAAC S.p.A. Soc. Unipersonale

Address:

Via Calari, 10 - 40069 Zola Predosa BOLOGNA - ITALY

Hereby declares that the partly completed machinery:

Description:

Gear motor for sliding gates

Model:

BLIZZARD 500; BLIZZARD 900.

the following essential requirements of the Machinery Directive 2006/42/EC 
(including all applicable amendments) have been applied and fulfilled:

1.1.2, 1.1.3, 1.1.5, 1.1.6, 1.2.3, 1.2.6, 1.3.1, 1.3.2, 
1.3.4, 1.3.9, 1.4.1, 1.4.2.1, 1.5.1, 1.5.2, 1.5.5, 1.5.6, 
1.5.7, 1.5.8, 1.5.10, 1.6.1, 1.6.4, 1.7.1, 1.7.2, 1.7.3, 
1.7.4.2, 1.7.4.3

and that the relevant technical documentation has been compiled in compliance 
with part B of Annex VII.
Furthermore, the following harmonised standards have been applied:

EN60335-1:2012 + A11:2014
EN60335-2-103:2015
EN 12100:2010
EN 13849-1:2015 CAT 2 PL “C”
EN 13849-2:2012

Undertakes to transmit by mail or by e-mail, in response to a reasoned request by 
the national authorities, relevant information on the partly completed machinery.
It is also declared that the partly completed machinery identified above may not be com-
missioned until the final machine - into which it will be incorporated - has been declared 
complaint with the provisions of the above mentioned Machine Directive 2006/42/EC.

Bologna, Italy, 06-12-2018

CEO
A. Marcellan

Summary of Contents for BLIZZARD 500

Page 1: ...BLIZZARD 500 BLIZZARD 900 Translation of the original instructions...

Page 2: ...All names and trademarks mentioned are the property of their respective manufac turers Customers may make copies exclusively for their own use This manual was published in 2018 Copyright FAAC S p A de...

Page 3: ...g 17 6 2 Installation of the Limit Switches 17 6 3 Final Operations 18 7 MAINTENANCE 18 7 1 Scheduled Maintenance 19 8 INSTRUCTIONS FOR USE 20 8 1 Safety recommendations 20 8 2 Product Warnings 20 8 3...

Page 4: ...They are therefore required by law among other things to carry out a risk analysis of the machine automatic gate in its entirety and take protective measures to fulfil the essential safety requiremen...

Page 5: ...ts Do not modify the original components in any way Close off the work site even temporarily and prevent access tran sit EC countries must comply with the legislation that transposes the European Cons...

Page 6: ...ted in the leaf of the gate themotorisedmovementmustbedisabledwhenthepedestriangate is not in a safe position The installation must be visible during the day and at night If it is not appropriate solu...

Page 7: ...kg 900 kg Sliding gate section speed 12 m min 14 m min 12 m min 14 m min Ambient operating temperature 20 C 55 C 20 C 55 C 20 C 55 C 20 C 55 C Type of use Residentialbuildings Apartment complexes Res...

Page 8: ...are accessories 3 Electric motor 4 Magnetic limit stop sensor 5 Magnetic limit switches 6 Release device 7 Start up capacitor 8 Earth connection 9 Z16 Module 4 pinion 7 Installation Accessories 1 Base...

Page 9: ...tec tive elements that prevent fingers from being introduced Presence of a safety area between the paving and lower edge of the leaf along its entire path providing protection from the risk of feet be...

Page 10: ...ifiedE g 6mmhexspannersetto2 5Nm 6 2 5 Nm ELECTRICIAN S SCISSORS 6 5 5 5 3 6 HSS DRILL BIT of specified sizes M8 THREAD CUTTER of specified sizes for steel rack to be screwed on SPIRIT LEVEL 4 3 EXAMP...

Page 11: ...8 18 90 0 50 50 7 90 0 50 95 288 132 50 6 288 132 Translation of the original instructions ENGLISH POSITIONING THE RACK 5 2 INSTALLATION DIMENSIONS POSITIONING THE BASE PLATE CENTRELINE DISTANCES Foun...

Page 12: ...nduits out from the hole 12 1 and install the base plate Do not bury the base plate in the concrete 4 Use a spirit level to check that the slab is horizontal making any corrections before the concrete...

Page 13: ...g automatic operation A lock with personalised key is available as an optional accessory MANUAL RELEASE 1 Open the plastic cap on the release device 15 1 2 Turn the lock clockwise using a coin or your...

Page 14: ...level then weld the other two spacers repeating the operations in steps 5 and 6 7 If necessary install another rack section as in step 1 8 Rest the section on the pinion bringing it up to the previou...

Page 15: ...use another rack section rest it on the pinion bring ing it up to the previous one use a third section screw clamps and a spirit level to line up the teeth and check it is level 21 8 Install the sect...

Page 16: ...er away from the slot 25 5 7 ADJUSTMENTS AND CHECKS RISKS PERSONAL PROTECTIVE EQUIPMENT The operations described in this section are fundamentally important to the integrity and operation of the gear...

Page 17: ...capacitor supplied between the two phases of the electric motor 6 Connect the other accessories to the electronic board not sup plied 7 Connect the mains power supply cable to the electronic board an...

Page 18: ...he machine and the system Logbook 7 Providetheowner operatoroftheautomationwiththeECDecla ration the system Logbook with the maintenance schedule and the user instructions of the automation INSTALLING...

Page 19: ...y 12 Check that the hand guard around the pinion is present and intact 12 Check that it is irreversible 12 Check that there is no loss of grease 12 Checktheconditionofthegearmotorcables thecableglands...

Page 20: ...andmentalhealthandbeawareof andresponsibleforthedangerswhichuseoftheproductcanleadto Do not remain in or walk drive through the area of operation of the automation system while it is moving Do not use...

Page 21: ......

Page 22: ...Sede legale FAAC S p A Soc Unipersonale Via Calari 10 40069 Zola Predosa BOLOGNA ITALY Tel 39 051 61724 Fax 39 051 09 57 820 www geniusg com BLIZZARD 500 900 22 532102 Rev B...

Reviews: