PREPARING THE MESHES AND POSTS
PRE-INSTALLATION AND THE CORRECT SIDE OF THE MESH BUNDLE
The posts are numbered from left to right (from downslope up)
S
: As standard, the mesh bundle is attached to the right of the post.
X
: If there are greater height differences, it is easier to pull the mesh down from the higher post to
the lower post.
Geobrugg will supply the bundle position according to customer specification at time of order.