Page 25/48
© Geobrugg AG, CH-8590 Romanshorn, Switzerland
GBE-100A-R / 08
10
INSTALLATION STEPS FOR SUPERSTRUCTURE
Schematic representation of the finished barrier:
The following shows the individual installation steps for a standard installation. Descriptions of the corresponding
details can be found further on in the manual.
•
Anchors are drilled and foundations completed
•
Set the posts that come pre-assembled with mesh.
Please exercise extreme caution in the danger zone while the posts can still tip forward or to the side.
•
Install lateral anchors and any intermediate anchors
•
Install the post top rope
Summary of Contents for GBE-100A-R
Page 2: ...Page 2 48 Geobrugg AG CH 8590 Romanshorn Switzerland GBE 100A R 08...
Page 3: ...Page 3 48 Geobrugg AG CH 8590 Romanshorn Switzerland GBE 100A R 08...
Page 45: ...Page 45 48 Geobrugg AG CH 8590 Romanshorn Switzerland GBE 100A R 08...
Page 46: ...Page 46 48 Geobrugg AG CH 8590 Romanshorn Switzerland GBE 100A R 08...
Page 47: ...Page 47 48 Geobrugg AG CH 8590 Romanshorn Switzerland GBE 100A R 08...