Page 12/43
© Geobrugg AG, CH-8590 Romanshorn, Switzerland
GBE-3000A / 16
4
STAKING OUT SUBJECT TO TERRAIN
GENERAL PRINCIPLES FOR STAKING OUT
Position of the barrier
Established simulation programs are available for calculating the optimum position of the barrier. Unfavorable lo-
cations with excessive bounce heights or shadows are identified.
Barrier line
The barrier line must be designed so that it is as straight and horizontal as possible. An irregular course as well
as depressions and cambers in the terrain between the posts must be avoided or corrected wherever possible.
Placing the foundations
The baseplate support of the foundation must be designed based on the terrain so that the lower support rope
remains close to the ground.
The baseplate must be positioned in such a way that the lower support rope is routed past the edges of the foun-
dations without being damaged by them.
Summary of Contents for GBE-3000A
Page 2: ...Page 2 43 Geobrugg AG CH 8590 Romanshorn Switzerland GBE 3000A 16...
Page 3: ...Page 3 43 Geobrugg AG CH 8590 Romanshorn Switzerland GBE 3000A 16...
Page 41: ...Page 41 43 Geobrugg AG CH 8590 Romanshorn Switzerland GBE 3000A 16...
Page 42: ...Page 42 43 Geobrugg AG CH 8590 Romanshorn Switzerland GBE 3000A 16...
Page 43: ...Page 43 43 Geobrugg AG CH 8590 Romanshorn Switzerland GBE 3000A 16...