Page 20/60
© Geobrugg AG, Switzerland
RXE-2000 / 11
8
PREPARING THE NETS AND POSTS
CORRECT SIDE OF THE NET BUNDLE
The posts are numbered from left to right (looking up)
S:
The net bundles are installed to the right of the posts as standard.
X:
In the event of significant height differences, it is easier to pull the net down from the higher post to the
lower post.
If specified in the order instructions, Geobrugg will supply the bundles on the left side of the posts.
Summary of Contents for RXE-2000
Page 17: ...Page 17 60 Geobrugg AG Switzerland RXE 2000 11...
Page 32: ...Page 32 60 Geobrugg AG Switzerland RXE 2000 11...
Page 58: ...Page 58 60 Geobrugg AG Switzerland RXE 2000 11...
Page 59: ...Page 59 60 Geobrugg AG Switzerland RXE 2000 11...
Page 60: ...Page 60 60 Geobrugg AG Switzerland RXE 2000 11...