background image

 

 

Geofabrics reserves the right to amend product documentation without notice and customers 
are requested to check as to the validity of the documentation they are using. 

 

 

 

Review Date May 2016 

 

Page 

2

 of 

Dear Customer  

 

On receipt of this equipment, please check all equipment has been received, ensure your site personnel 
read  and  understand  the  operating,  maintenance,  installation  and  safety  information,  and  use  the 
equipment in a safe manner. 

  You are responsible for the safe operation of the equipment and the safety of your personnel. 

  Standard Occupational,  Health and Safety guidelines should be  followed  as per normal site 

operations. Site safety and safe work practices are your responsibility.  

  At  the  conclusion  of  the  use  of  the  equipment,  please  clean  the  equipment,  repack  it  for 

transportation and return to Geofabrics. 

  Please advise if there are any missing parts. All equipment usage must be in accordance with 

Geofabrics’ Hire Agreement. You will be charged for any damaged or missing components. 

ELCO

ROCK

®

 FILLING FRAME & J-BIN - OPERATING AND SAFETY INSTRUCTIONS

 

WARNING! 

 
 

  Any alterations to this hire equipment may prove dangerous to the operator and will be in breach 

of the Equipment Hire Agreement. 

  Service  must  only  be  performed  by  an  authorised  Geofabrics  service  organisation  or 

representative. 

  Please contact Geofabrics (0800 60 60 20) for return of this equipment or servicing if it is found 

to be faulty.

 

  All hire related documentation, operating and safety instructions are available on our website 

(

www.geofabrics.co.nz

).

 

 

 

Figure 1 

OPERATING AND SAFETY INSTRUCTIONS 

Summary of Contents for ELCOROCK FILLING FRAME

Page 1: ... Base 2 1 Support Post 3 1 Hopper 4 2 J Bin Attachments 5 1 Utility Box 6 1 Hose 7 1 Clamp Pulley System 8 2 Circular Clamps 9 1 Documentation 17 pages 7 pages Operating and Safety Instructions 10 pages Installation Manual This equipment has received an in service inspection and was found to have no obvious defects CHECKED OUT BY CHECKED IN BY Name Name Signature Signature Comments ELCOROCK FILLIN...

Page 2: ...ponsibility At the conclusion of the use of the equipment please clean the equipment repack it for transportation and return to Geofabrics Please advise if there are any missing parts All equipment usage must be in accordance with Geofabrics Hire Agreement You will be charged for any damaged or missing components ELCOROCK FILLING FRAME J BIN OPERATING AND SAFETY INSTRUCTIONS WARNING Any alteration...

Page 3: ...nsidered a construction activity the contractor using the hire equipment must prepare and implement a site safety plan that incorporates the safe work methods for high risk work involving ELCOROCK Filling Frame and J Bins Including the potential need to work at height on the equipment Safety Precautions and Working Techniques As the ELCOROCK Filling Frames and J Bins are utilised in conjunction wi...

Page 4: ...e personnel or the public Filling Process Filling should be conducted as per the ELCOROCK Installation Guidelines for 2 5m3 Containers Warning If there is a need to work from height on the ELCOROCK Filling Frame and J Bins this needs to be taken into account by the contractor s site safety plan Refer to the Health and Safety provisions in Employment Act 1992 regarding the need to take all practica...

Page 5: ...ONENTS The ELCOROCK Filling Frame and J Bins consists of a free standing hopper complete with two J Bin cradles Fig 3 4 5 and is accompanied by 2 J Bin attachments Fig 7 a number of smaller components are also included to set up the filling frame and bins To ensure no parts are lost all components should be stored and transported as a set in such a way as not to cause damage to the equipment Fig 2...

Page 6: ...t to amend product documentation without notice and customers are requested to check as to the validity of the documentation they are using Review Date May 2016 Page 6 of 7 Figure 6 Figure 8 Figure 10 Figure 12 Figure 11 Figure 7 ...

Page 7: ...ley system Circular clamps Hose Fig 10 Check the hose is not damaged Clamp Pulley System Fig 11 Check the clamp is not bent Check the rope is not frayed or damaged Circular Clamps Fig 12 Check the clamps not bent or damaged Check the fastening mechanism functions correctly Check the clamps open and close around the filling ports effectively Geofabrics New Zealand Ltd 14 Goodman Place P O BOX 12536...

Reviews: