25
WIRE MANAGEMENT
g. Hot glue Futaba J male housing of the wheel rotation sensor wires to the shock towers of the
chassis.
h. Loop the front wheel rotation sensor wires around the front supports in order to reduce slack to
the minimum required to route these wires, if needed.
i. Zip tie front and rear wheel rotation sensor wires over the connector housings hot glued to the
shock tower.
j. Install the 4 small body clips into the plastic electronics box supports. Ensure that the USB
cable, split loom, and front wheel rotation sensor cables are routed through the appropriate
cutouts.
64
Summary of Contents for AutoRally
Page 1: ...AutoRally Chassis Instructions Version 1 4 June 2018 Georgia Institute of Technology...
Page 2: ......
Page 79: ...27 APPENDIX A PARTS Futaba FUTM1725 Charger for Futaba 4PV Glitch Capacitor GPS antenna 75...
Page 80: ...27 APPENDIX A PARTS GPS antenna cable GPS box fan Hallogic OH090U Hall Effect sensors 76...
Page 88: ...27 APPENDIX A PARTS 1 M3 4mm screw 27 7 3 GPS Box 8 M3 8mm screws 4 M3 hex nuts 84...
Page 89: ...27 APPENDIX A PARTS 2 M1 4 fan screws 2 M1 4 fan nuts 2 M3 25mm screws 85...
Page 92: ......