36
4.5.2 I/O Monitoring Settings
You can set the schedule for I/O monitoring to start.
Span 1- Span 3:
Set different time frames during the day to enable I/O monitoring.
Each day can be divided into 3 time frames, represented by Span 1 to Span 3.
Weekend:
If you don’t want to apply the span settings to the weekend and need I/O
monitoring for the whole day, enable this option and define whether your weekend
includes
Saturday and Sunday
or
Only Sunday
.
Special Day:
Enable I/O monitoring on a specified day.