Instructions for Use
CPET
Version: 4 | Release date: 01 April 2022
page 57
3.1.4.6.3
Edit Training Plan
Clicking on the date opens
a window for changing the
day.
The duration can be edited
by clicking in the field.
Changing the duration
automatically recalculates
the energy consumption.
Clicking on the Intensity
field opens a window for
editing the displayed text
and colour marking it.
The heart rate ranges can
be changed in a window
after clicking on the HR
range field. Changing the
heart rate automatically
recalculates the energy
consumption.