6
3. OPERATION DESCRIPTION
3.1
INSTALLATION
1) Apart the wooden package. Avoid damaging the machine.
2) a) Loosing 4 screws at the end of masters
。
(Do not unscrew the sliding
shaft, leave inside the track).
b) Lift up the master (Step 1).
c) Sliding the master towards turntable, until the sliding shaft move into
locking position (Step 2).
d) Master is in position to be fully lifted and tighten all screws (Step 3).
1
..
2
..
3
..
Summary of Contents for GPPW-1500B
Page 6: ...4 2 2 MACHINE DIMENSION ...
Page 7: ...5 2 3 Machine Description ...
Page 11: ...9 3 3 OPERATION OF CONTROL PANEL ...
Page 19: ...17 ...
Page 20: ...18 ...
Page 22: ...20 ...
Page 25: ...23 6 PART LIST 6 1 SEAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 ...
Page 27: ...25 6 2 TOWER ...