Instruction Manual
KH Director®
EN
2018-02-19
18
The illustration above shows a schematic representation of the principle of operation. Please
note the following when installing the devices:
4.7
Selection and Assignment of the Pumps
In the
GCC
under Regulation, select the category KH Director, activate the KH measurement.
Save the changes.
For the measurement, three pumps of the GHL Doser 2.1 are required. As default, pumps 1-3
are preselected for the functions
Water sample
,
Reagent
and
Waste
water
.
WARNING
•
KH Director
and
Doser
must be positioned away and protected from
splashing water and excess humidity!
•
Splashing water/saltwater and or condensing humidity (e.g.
occurring nearby the sump) will
destroy the devices
–
this voids all
warranty claims!
DANGER
•
If you have made or changed settings for your device via the
GCC
,
you must
always
save them using the "
Save changes
" button.