Instruction Manual
KH Director®
EN
2018-02-19
22
The tube must therefore be routed steadily from the reagent bottle to the corresponding
metering pump.
After connecting the tubes, the tube of the pump (here pump 2), which supplies the reagent
liquid, must be vented.
This can either be done manually using the buttons on the GHL Doser 2.1 or via the
GCC
under
Manual dosing
.
TIP
Make a note of the assembled tube length for taking the water sample
(here Pump 1) and the tube length to the Water Sample input of the KH
Directors and add the two lengths. You will need this total tube length later
when determining the
Sample tube volume
.
Assembly
Water sample
Reagent
Waste water
stacked
16
cm (6.3“)
17
cm (6.7“)
17
cm (6.7“)
side by side
26
cm (10.2“)
23,5
cm (9.3“)
21
cm (8.3“)