Fueling instructions for use with ASTM E3053-17
GHP Large with By-Pass Medium and Low Procedure
Test Fuel:
Follow the guidelines of the cordwood standard (E3053-17) for correct moisture
and weight ratios for the core and sub loads. There are six pieces in total. The
nominal length is 16’’.
Coal Bed:
The coal bed will always result in running a high burn. There may be large pieces
of fuel left after the high burn, as soon as the high burn has been complete, move
the larger raw pieces toward the middle of the firebox stacked up for best
combustion. Load the test fuel at the very low end of the coal bed within 0.2lbs.
This allows more room to place the fuel.
Fuel Loading & Settings:
Level the coal bed before you start sampling. If there happens to be any raw
pieces left over, place them in the very rear of the firebox. The Fan is turned on
high after the primary control has been set. Keep the door open no longer than
23 of 142
Summary of Contents for GWS-2200
Page 26: ...26 of 142 ...
Page 35: ...35 of 142 ...
Page 36: ...36 of 142 ...
Page 55: ...55 of 142 ...
Page 56: ...56 of 142 ...
Page 64: ...64 of 142 ...
Page 65: ...65 of 142 ...
Page 73: ...73 of 142 ...
Page 74: ...74 of 142 ...
Page 78: ...78 of 142 ...
Page 79: ...79 of 142 ...
Page 80: ...80 of 142 ...
Page 81: ...81 of 142 ...
Page 82: ...82 of 142 ...
Page 83: ...83 of 142 ...
Page 84: ...84 of 142 ...
Page 85: ...85 of 142 ...
Page 86: ...86 of 142 ...
Page 88: ...88 of 142 ...
Page 89: ...89 of 142 ...
Page 90: ...90 of 142 ...
Page 91: ...91 of 142 ...
Page 94: ...94 of 142 ...
Page 97: ...97 of 142 ...
Page 98: ...98 of 142 ...
Page 99: ...99 of 142 ...
Page 138: ...227 of 229 ...
Page 139: ...228 of 229 ...
Page 140: ...229 of 229 ...